Site Survey: |
|
|
Construction Date |
|
|
Constructed by: |
CONSTRUCTION DET “B” |
|
Established: |
JUN 1945 -
USAAC
JAN 1950 - USCG |
|
Disestablished: |
1947 -
USAAC
31 DEC 1979 - USCG |
|
Operated by: |
JUN 1945 –
1947, USAAC
1950 – 31 DEC 1979, USCG |
|
Chain: |
U.S WEST
COAST |
|
Station Letter
designation: |
1H5, 1H7 –
“G”
1H4 – “P” |
|
Station code name: |
|
|
Station Unit Number: |
CG Unit 405 |
|
Radio Call Sign: |
|
|
Station aka: |
|
|
On-air testing date: |
1H7 – 15
JUN 1945 |
|
Operational date: |
1H7 – 01
JUL 1945
2H1, 2H2 – 01 FEB 1950 |
|
Operations Ceased: |
1H7 – 1947
1H4, 1H5 – 312400Z DEC 1979 |
|
Station Operation: |
1945 –
1947 Single SLAVE (SS)
1948 – 1964 Single SLAVE (SS)
1964 – 31 DEC 1979 Double SLAVE/SECONDARY (DS) |
|
Station pair: |
1H7 –
POINT SUR
2H1, 1H4 - SAN MATEO
2H2, 1H5 - POINT ARENA |
|
Loran Rate: |
1H7, 2H1,
2H2, 1H4, 1H5 |
|
On-Air: |
1H7 – 01
JUL 1945
2H2 – 1948
2H1 – 1964
1H4 – 1970
1H5 - 1970 |
|
Off-Air |
1H7 – 1947
2H1 – 1970 Change of rate
2H2 – 1970 Change of rate
1H4 – 312400Z DEC 1979 Loran A phased out
1H5 – 312400Z DEC 1979 Loran A phased out |
|
Monitor Rate: |
|
|
Equipment: |
1964 – AM-1700/FPN Installation |
|
Antenna Type: |
280ft – Wind Turbine |
|
Personnel Allowance: |
JAN 1953 – ETC, ET1, ET2, 3 ET3, CS1, EN2, 3 SN |
|
Miscellaneous: |
Mobile
Unit Group "G" 1944 |
|
Commanding Officers /
Officers in Charge |
CO: CWO
Froelich 1966
OINC: ETC Hayden 1966 - 1967
OINC: ETC Bob Olsen 1971
OINC: ETC Bill Dibble 1972
OINC: ETC Bill Towne 1974
OINC: ETC Daniel D Larson 1974 |